Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
PD ISO/TR 4191:2014 Plastics piping systems for water supply. Unplasticized poly(vinyl chloride)(PVC-U) and oriented PVC-U (PVC-O). Guidance for installation, 2014
- Section sec_1
- Section sec_2
- Section sec_3
- Section sec_3.1
- Section sec_3.1.1
- Section sec_3.1.2
- Section sec_3.1.3
- Section sec_3.1.4
- Section sec_3.1.5
- Section sec_3.1.6
- Section sec_3.1.7
- Section sec_3.1.8
- Section sec_3.1.9
- Section sec_3.1.10
- Section sec_3.1.11
- Section sec_3.1.12
- Section sec_3.2
- Section sec_3.3
- Section sec_4
- Section sec_4.1
- Section sec_4.1.1
- Section sec_4.1.2
- Section sec_4.1.3
- Section sec_4.2
- Table tab_1
- Figure fig_1
- Section sec_5
- Section sec_5.1
- Figure fig_2
- Section sec_6
- Section sec_6.1
- Section sec_6.1.1
- Section sec_6.1.2
- Section sec_6.1.3
- Section sec_6.2
- Section sec_6.2.1
- Section sec_6.2.2
- Section sec_6.2.3
- Section sec_6.2.4
- Section sec_6.3
- Section sec_6.3.1
- Section sec_6.3.1.1
- Section sec_6.3.1.2
- Section sec_6.3.1.3
- Section sec_6.3.2
- Section sec_6.3.2.1
- Section sec_6.3.2.2
- Section sec_6.3.2.3
- Section sec_6.3.2.4
- Section sec_6.3.2.5
- Section sec_6.3.2.6
- Section sec_6.3.2.7
- Section sec_6.4
- Section sec_6.4.1
- Section sec_6.4.2
- Section sec_6.4.3
- Section sec_7
- Section sec_7.1
- Section sec_7.2
- Section sec_7.3
- Table tab_j
- Figure fig_9
- Section sec_7.4
- Figure fig_10
- Table tab_2
- Table tab_3
- Section sec_7.5
- Table tab_4
- Figure fig_11
- Table tab_5
- Section sec_8
- Section sec_8.1
- Section sec_8.2
- Section sec_9
- Section sec_9.1
- Figure fig_12
- Figure fig_13
- Section sec_9.2
- Figure fig_14
- Table tab_6
- Section sec_9.3
- Section sec_9.3.1
- Section sec_9.3.2
- Section sec_9.3.3
- Figure fig_15
- Figure fig_16
- Section sec_9.3.4
- Table tab_n
- Figure fig_17
- Section sec_9.3.5
- Table tab_7
- Figure fig_18
- Section sec_9.3.6
- Section sec_9.3.7
- Section sec_9.3.8
- Section sec_9.4
- Section sec_9.4.1
- Section sec_9.4.1___1
- Section sec_10
- Section sec_10.1
- Section sec_10.2
- Section sec_10.2.1
- Section sec_10.2.2
- Section sec_10.2.3
- Figure fig_21
- Section sec_10.2.4
- Section sec_10.2.5
- Section sec_10.2.6
- Section sec_10.2.7
- Section sec_10.2.8
- Section sec_10.2.9
- Table tab_p
- Figure fig_22
- Section sec_10.2.10
- Section sec_10.2.11
- Section sec_10.2.12
- Section sec_10.3
- Section sec_10.3.1
- Figure fig_23
- Section sec_10.4
- Section sec_10.4.1
- Section sec_10.4.2
- Section sec_10.4.3
- Section sec_10.5
- Section sec_10.5.1
- Section sec_10.5.2
- Section sec_10.5.3
- Section sec_10.5.4
- Section sec_11
- Section sec_11.1
- Section sec_11.2
- Section sec_11.3
- Section sec_12
- Section sec_13
- Section sec_14
- Section sec_15
- Table tab_8
- Section sec_16
- Section sec_17
- Annex sec_A
- Annex sec_A.1
- Table tab_A.1
- Annex sec_A.2
- Table tab_A.2
- Reference ref_1
- Reference ref_2
- Reference ref_3
- Reference ref_4
- Reference ref_5
- Reference ref_6
- Reference ref_7
- Reference ref_8
- Bibliography
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions, symbols, and abbreviations
- 3.1 Terms and definitions
- 3.2 Symbols
- 3.3 Abbreviations
- 4 Parameters influencing design
- 4.1 Allowable operating pressure
- 4.2 Ring stiffness of pipes
- 5 Hydraulic properties
- 5.1 Loss of head
- 6 Assembly methods
- 6.1 General
- 6.2 Integral rubber ring joints
- 6.3 Solvent cement joints
- 6.4 Mechanical joints
- 7 Storage, handling, and transport of pipes
- 7.1 Handling
- 7.2 Transport
- 7.3 Storage
- 7.4 Cold bending on site
- 7.5 Anchoring and thrust blocks
- 8 Storage, handling, and transport of fittings, valves, and ancillaries
- 8.1 PVC-U fittings, valves, and ancillaries are light and easy to handle
- 9 Installation
- 9.1 Installation below ground
- 9.2 Pipe deflection
- 9.3 Installation above ground
- 9.4 Installation in ducts
- 10 Commissioning by site pressure testing
- 10.1 General
- 10.2 Preparation for test
- 10.3 Test pressures
- 10.4 Applying the test
- 10.5 Interpretation of results
- 11 Contaminated soil
- 12 Corrosion protection of metal parts
- 13 Pressure surge
- 14 Usage at lower temperature
- 15 Fatigue
- 16 Repairs
- 17 Pipeline detection
- Annex A
(informative)
Classification of soils
- Bibliography [Go to Page]