ASME B30.19 - 2016(R2021) Cableways, 2016
- CONTENTS
- FOREWORD
- ASME B30 COMMITTEE ROSTER
- B30 STANDARD INTRODUCTION [Go to Page]
- SECTION I: SCOPE
- SECTION II: SCOPE EXCLUSIONS
- SECTION III: PURPOSE
- SECTION IV: USE BY REGULATORY AGENCIES
- SECTION V: EFFECTIVE DATE
- SECTION VI: REQUIREMENTS AND RECOMMENDATIONS
- SECTION VII: USE OF MEASUREMENT UNITS
- SECTION VIII: REQUESTS FOR REVISION
- SECTION IX: REQUESTS FOR INTERPRETATION
- SECTION X: ADDITIONAL GUIDANCE
- ASME B30.19-2016 SUMMARY OF CHANGES
- CABLEWAYS
- Chapter 19-0 Scope, Definitions, Personnel Competence, and References [Go to Page]
- SECTION 19-0.1: SCOPE OF B30.19
- SECTION 19-0.2: DEFINITIONS [Go to Page]
- 19-0.2.1 Types of Cableways
- 19-0.2.2 General
- SECTION 19-0.3: PERSONNEL COMPETENCE
- SECTION 19-0.4: REFERENCES
- Chapter 19-1 Construction and Characteristics [Go to Page]
- SECTION 19-1.1: LOAD RATINGS [Go to Page]
- 19-1.1.1 Basis
- 19-1.1.2 Load Rating Chart
- SECTION 19-1.2: DESIGN AND MANUFACTURE [Go to Page]
- 19-1.2.1 General
- 19-1.2.2 Structures
- 19-1.2.3 Foundations
- SECTION 19-1.3: CONSTRUCTION AND ERECTION [Go to Page]
- 19-1.3.1 Foundations, Anchors, and Guys
- 19-1.3.2 Rigging and Reeving
- 19-1.3.3 Ropes
- 19-1.3.4 Sheaves
- 19-1.3.5 Hoists
- 19-1.3.6 Guards for Moving Parts
- 19-1.3.7 Load Hook and Lower Load Block Assembly
- 19-1.3.8 Slack Carriers and Upper Load Block Carriage
- 19-1.3.9 Assembly Construction Procedure
- 19-1.3.10 Cabs and Machinery Enclosures
- 19-1.3.11 Controls
- 19-1.3.12 Monitoring Devices
- 19-1.3.13 Traveling Towers
- 19-1.3.14 Aids to Aviation
- 19-1.3.15 Personal Protection Ropes
- 19-1.3.16 Luffing Hoist
- Chapter 19-2 Inspection, Testing, and Maintenance [Go to Page]
- SECTION 19-2.1: INSPECTION [Go to Page]
- 19-2.1.1 Inspection Classification
- 19-2.1.2 Frequent Inspection
- 19-2.1.3 Periodic Inspection
- 19-2.1.4 Cableways Not in Regular Use
- SECTION 19-2.2: TESTING [Go to Page]
- 19-2.2.1 Operational Tests
- 19-2.2.2 Load Test
- SECTION 19-2.3: MAINTENANCE [Go to Page]
- 19-2.3.1 Preventive Maintenance
- 19-2.3.2 Maintenance Procedures
- 19-2.3.3 Adjustments and Repairs
- 19-2.3.4 Lubrication
- SECTION 19-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE [Go to Page]
- 19-2.4.1 General
- 19-2.4.2 Inspection
- 19-2.4.3 Rope Replacement
- 19-2.4.4 Rope Maintenance
- Chapter 19-3 Operation [Go to Page]
- SECTION 19-3.1: OPERATOR QUALIFICATIONS AND OPERATING PRACTICE [Go to Page]
- 19-3.1.1 Operators
- 19-3.1.2 Qualifications for Operators
- 19-3.1.3 Operating Practices
- SECTION 19-3.2: OPERATING PRACTICES [Go to Page]
- 19-3.2.1 Handling the Load [Go to Page]
- 19-3.2.1.1 Size of Load
- 19-3.2.1.2 Attaching the Load
- 19-3.2.1.3 Moving the Load
- 19-3.2.1.4 Holding the Load
- 19-3.2.2 Personnel Lifting
- SECTION 19-3.3: SIGNALS [Go to Page]
- 19-3.3.1 Standard Signals
- 19-3.3.2 Hand Signals
- 19-3.3.3 Special Signals
- 19-3.3.4 Instructions
- SECTION 19-3.4: MISCELLANEOUS [Go to Page]
- 19-3.4.1 Ballast or Counterweight
- 19-3.4.2 Aerial Marking
- 19-3.4.3 Hoist, Ropes, and Rope Anchors
- 19-3.4.4 Operating Near Electric Power Lines
- 19-3.4.5 Cabs
- 19-3.4.6 Refueling
- 19-3.4.7 Fire Extinguishers
- 19-3.4.8 Cableway Lockout/Tagout
- Figures [Go to Page]
- Fig. 19-0.2.1-1 Fixed Cableway
- Fig. 19-0.2.1-2 Luffing Cableway
- Fig. 19-0.2.1-3 Parallel Cableway
- Fig. 19-0.2.1-4 Radial Cableway
- Fig. 19-0.2.2-1 Two-Drum Cableway Hoist
- Fig. 19-0.2.2-2 Trolley Hoist Unit
- Fig. 19-0.2.2-3 Multisheave Endless Rope Trolley Hoist Unit
- Fig. 19-0.2.2-4 Luffing Hoist Unit
- Fig. 19-1.3.12-1 Standard Hand Signals for Controlling Cableway Operations
- Fig. 19-3.4.4-1 Danger Zone for Cableways and Lifted Loads Operating Near Electrical Transmission Lines
- Table [Go to Page]
- Table 19-3.4.4-1 Required Clearance for Normal Voltage in Operation Near High Voltage Power Lines [Go to Page]