Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
CDC Reference Guidelines - Design & Construction Standards, 2017
- ... [Go to Page]
- 2.0 Introduction [Go to Page]
- 2.1 Administration of Thethe Reference Guidelines
- 2.2 Codes and Standards
- 2.3 Accessibility
- 2.4 Sustainable Design and High Performance Building Guidelines
- 2.4 Sustainable Design and High Performance Building Guidelines
- Per E.O. 13514 Section 2 (g) (iii), Federal agencies are required to ensure that at least 15 percent of the agency’s existing buildings (above 5,000 gross square feet) and building leases (above 5,000 gross square feet) meet the Guiding Principles by ...
- GUIDING PRINCIPLES FOR SUSTAINABLE NEW CONSTRUCTION AND MAJOR RENOVATIONS [Go to Page]
- 2.5 Furniture & Equipment Design and Procurement
- 2.6 Commissioning Policy
- 2.7 Hazardous Materials Policy
- 2.8 Energy Policy
- 2.9 Water Management Policy
- 2.10 Dispatch of Loads
- 2.11 Value Engineering
- 3 Procedures [Go to Page]
- 3.0 Introduction [Go to Page]
- 3.1 CDC General Drawing Requirements (CAD)
- END OF SECTION
- 3.2 Drawing Requirements
- END OF SECTION 3.3 Existing Condition Facility Documentation
- END OF SECTION 3.4 Numbering Systems
- 3.5 Furniture Procurement
- 3.6 Commissioning
- 3.7 Hazardous Materials
- 3.8 Health and Safety
- 3.9 Operating and Maintenance Manuals
- 4 PLANNING AND DESIGN GUIDELINES [Go to Page]
- 4.0 Introduction [Go to Page]
- 4.1 General Planning Criteria [Go to Page]
- 4.1.1 Master Plan
- 4.1.2 Environmental Health and Safety
- 4.1.3 Security
- 4.1.4 Civil & Site Development Guidelines
- 4.1.5 Campus Mechanical
- 4.1.6 Campus Electrical
- 4.1.7 Building Shell
- 4.1.8 General Facilities
- 4.2 General Laboratory Planning [Go to Page]
- 4.2.1 Biological Laboratories
- 4.2.2 Chemical Laboratories
- 4.2.3 Engineering Laboratories
- 4.2.4 Radiation Laboratories
- 4.3 General Animal Facility Planning [Go to Page]
- 4.3.1 Primate Facilities
- 4.3.2 Rodent Facilities
- 4.3.3 Canine Facilities
- 4.3.4 Insect Facilities
- 4.3.4a Flying Insect Facilities (Mosquitoes)
- 4.3.4b Crawling Insect Facilities (Ticks, Mites, Lice, Fleas)
- 4.4 Office Planning
- 4.5 Support Facilities Planning [Go to Page]
- 4.5.0 Building Support Facilities
- 4.5.1 Conference Facilities With Videoconferencing
- 4.5.2 Cafeterias
- 4.5.3 Break Rooms
- 4.5.4 Vending Areas
- 4.5.5 Snack Bars
- 4.5.6 Travel Office
- 4.5.7 Share (Employee Store)
- 4.5.8 Credit Union
- 4.5.9 Lifestyle Facilities
- 4.5.10 Lobby Areas
- 4.5.11 Toilet Facilities
- 4.5.12 Stairwells
- 4.5.13 Janitor Closets
- 4.5.14 Mechanical Rooms
- 4.5.15 Electrical Switchgear Rooms (Main Service Entrance)
- 4.5.16 Electrical Rooms
- 4.5.17 Telephone Equipment Rooms (PBX)
- 4.5.18 Telecommunication/LAN Rooms
- 4.5.19 Lactation Rooms
- 4.5.20 Campus Support Facilities
- END OF SECTION
- 4.5.21 Central Utility Plants
- 4.5.22 Data Processing Facilities
- 4.5.23 Transshipping Facilities
- 4.5.24 Laboratory Chemical Storage Facilities
- 4.5.25 Waste Handling Facilities
- 4.5.26 Parking Facilities
- 4.5.27 Integrated Facilities Management System (IFMS)
- 4.5.28 Stationary Storage Battery System Rooms
- 5 BUILDING ELEMENTS [Go to Page]
- 5A SUBSTRUCTURE [Go to Page]
- 5A0 Introduction
- 5A1 Foundations [Go to Page]
- 5A1.10 Standard Foundations
- 5A1.20 Special Foundations
- 5A1.30 Slab On Grade
- 5A2 Below Grade Construction [Go to Page]
- 5A2.10 Below Grade Excavations
- 5A2.20 Below Grade Walls
- 5B SHELL [Go to Page]
- 5B.0 Introduction [Go to Page]
- 5B1.10 Floor Construction
- 5B1.20 Roof Construction
- 5B2 Exterior Enclosure [Go to Page]
- 5B2.10 Exterior Walls
- 5B2.20 Exterior Windows
- 5B2.30 Exterior Doors
- 5B3 Roofing [Go to Page]
- 5B3.10 Roof Coverings
- 5B3.20 Roof Openings
- 5C INTERIORS [Go to Page]
- 5C.0 Introduction
- 5C1 Interior Construction [Go to Page]
- 5C1.10 Partitions
- 5C1.20 Interior Doors
- 5C1.30 Fittings
- 5C2 Stairs [Go to Page]
- 5C2.10 Interior Stairs Construction
- 5C2.20 Interior Stair Finishes
- 5C3 Interior Finishes [Go to Page]
- 5C3.10 Wall Finishes
- 5C3.20 Floor Finishes
- 5C3.30 Ceiling Finishes
- 5D SERVICES [Go to Page]
- 5D0 Introduction
- 5D1 Conveying Systems [Go to Page]
- 5D1.10 Elevators and Lifts
- 5D1.20 Escalators and Moving Walks
- 5D2 Plumbing Systems [Go to Page]
- 5D2.10 Plumbing Fixtures
- 5D2.20 Domestic Water Distribution
- 5D2.30 Sanitary Waste and Vent Systems
- 5D2.40 Rain Water Drainage
- 5D2.50 Gas Distributing Systems
- 5D3 HVAC [Go to Page]
- 5D3.10 Boiler Room Piping and Specialties
- 5D3.20 Piping Distribution Systems
- 5D3.21 Air Distribution Systems
- 5D3.22 Exhaust Ventilation Systems
- 5D3.23 Steam Distribution Systems
- 5D3.25 Glycol Distribution Systems
- 5D3.30 Building Automation Systems
- 5D4 Fire Protection
- 5D4.10 Sprinklers
- 5D4.20 Standpipe Systems
- 5D4.30 Fire Pumps
- 5D4.40 Fire Protection Specialties
- 5D4.50 Other Fire Protection Systems
- 5D5 Electrical [Go to Page]
- 5D5.10 Electrical Service & Distribution
- 5D5.11 Electrical Studies
- 5D5.20 Lighting & Branch Wiring
- 5D5.30 Communications, Security & Fire Alarm Systems
- 5D5.40 Lightning Protection/ Grounding
- 5D5.41 Emergency, Legally Required Standby, and Standby Power Systems
- 5D5.42 Special Equipment
- 5D5.43 Communication And Signaling Systems
- 5D5.44 Freezer Alarm System
- 5E EQUIPMENT & FURNISHINGS [Go to Page]
- 5E0 Introduction
- 5E1 Equipment [Go to Page]
- 5E1.10 Office And Office Support Equipment
- 5E1.20 Laboratory And Laboratory Support Equipment
- 5E1.30 Vehicular Equipment
- 5E2 Furnishings [Go to Page]
- 5E2.10 Fixed Furnishings
- 5E2.20 Movable Furnishings
- 5F SPECIAL CONSTRUCTION & DEMOLITION [Go to Page]
- 5F0 Introduction
- 5F1 Special Construction Systems [Go to Page]
- 5F1.10 Special Structures
- 5F1.20 Integrated Construction
- 5F1.50 Special Controls & Instrumentation
- 5F2 Selective Building Demolition [Go to Page]
- 5F2.10 Building Elements Demolition
- 5F2.20 Hazardous Components Abatement
- 5G BUILDING SITEWORK [Go to Page]
- 5G0 General
- 5G1 Site Preparation [Go to Page]
- 5G1.10 Site Preparation
- 5G1.20 Site Demolition & Relocation
- 5G1.30 Site Earthwork
- 5G1.40 Hazardous Waste Remediation
- 5G2 Site Improvements [Go to Page]
- 5G2.10 Roadways
- 5G2.20 Parking Lots
- 5G2.30 Pedestrian Circulation
- 5G2.40 Site Development
- 5G2.50 Landscaping
- 5G2.60 Irrigation
- 5G3 Site Mechanical Utilities [Go to Page]
- 5G3.10 Water Supply
- 5G3.20 Sanitary Sewer
- 5G3.30 Storm Sewer
- 5G3.40 Heating Distribution
- 5G3.50 Cooling Distribution
- 5G3.60 Fuel Distribution
- 5G4 Site Electrical Utilities [Go to Page]
- 5G4.10 Electrical Distribution
- 5G4.20 Site Lighting
- 5G4.30 Site Communications & Security
- 5G4.90 Other Site Electrical Utilities
- 5G5 Other Site Construction [Go to Page]
- 5G5.10 Service And Pedestrian Tunnels
- 5G5.20 Pest Management Program During Construction
- 6 APPENDIX [Go to Page]
- 6.10 Request for Exception Form
- 6.20 Request for Clarification Form
- 6.30 Interiors
- 6.40 Document components, writing/editing rules and uniformatUniFormat
- 6.50 Survey Control Monuments’ Locations and Descriptions
- Electrical
- 6.60 Acronyms
- 6.70 Glossary
- 6.80 Accessibility
- 6.90 Facilities Master Planning Guide
- 6.91 Wayfinding Masterplan
- 6.92 BAS Graphics Standards
- 6.93 Lactation Support Program
- 6.94 ELECTRICAL
- Arc-Flash and Shock Hazard Appropriate PPE Required
- Arc-Flash and Shock Hazard Appropriate PPE Required [Go to Page]