Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
City of San Diego, The "Whitebook", Standard Specifications For Public Works Construction, 2015
- Introduction
- Table of Contents
- Part 1 - General Provisions (A) [Go to Page]
- Section 1 - Terms, Definitions, Abbreviations, Units of Measure, and Symbols
- Section 2 - Scope and Control of the Work
- Section 3 - Changes in Work
- Section 4 - Control of Materials
- Section 5 - Utilities
- Section 6 - Prosecution, Progress, and Acceptance of the Work
- Section 7 - Responsibilities of the Contractor
- Section 8 - Facilities for Agency Personnel
- Section 9 - Measurement and Payment
- Part 1 - General Provisions (B) Job Order Contract (JOC) Only [Go to Page]
- Section 1 - Terms, Definitions, Abbreviations, Units of Measure, and Symbols
- Section 2 - Scope and Control of the Work
- Section 3 - Changes in Work
- Section 6 - Prosecution, Progress, and Acceptance of the Work
- Section 7 - Responsibilities of the Contractor
- Part 1 - General Provisions (C) Design-Build (DB) and Multiple Award Construction Contract (MACC) Contracting Only [Go to Page]
- Section 1 - Terms, Definitions, Abbreviations, Units of Measure, and Symbols
- Section 2 - Scope and Control of Work
- Section 3 - Changes in Work
- Section 4 - Control of Materials
- Section 5 - Utilities
- Section 6 - Prosecution, Progress, and Acceptance of the Work
- Section 7 - Responsibilities of the Contractor
- Section 9 - Measurement and Payment
- Section 10 - Green Buildings and Storm Water Management
- Part 2 - Construction Materials [Go to Page]
- Section 200 - Rock Materials
- Section 201 - Concrete, Mortar, and Related Materials
- Section 202 - Masonry Materials
- Section 203 - Bituminous Materials
- Section 206 - Miscellaneous Metal Items
- Section 207 - Gravity Pipe
- Section 209 - Pressure Pipe
- Section 210 - Paint and Protective Coatings
- Section 211 - Material Tests
- Section 212 - Water and Sewer System Valves and Appurtenances
- Section 213 - Engineering Geosynthetics
- Section 215 - Private Sewer Pumps
- Section 218 - Detectable Warning Tiles
- Part 3 - Construction Methods [Go to Page]
- Section 300 - Earthwork
- Section 301 - Treated Soil, Subgrade Preparation, and Placement of Base Materials
- Section 302 - Roadway Surfacing
- Section 303 - Concrete and Masonry Construction
- Section 304 - Metal Fabrication and Construction
- Section 306 - Open Trench Conduit Construction
- Section 307 - Jacking and Tunneling
- Section 308 - Microtunneling
- Section 309 - Monuments
- Section 314 - Traffic Striping, Curb and Pavement Markings, and Pavement Markers
- Section 315 - Horizontal Directional Drilling
- Section 316 - Pipe Bursting
- Section 317 - Pipe Fusion
- Part 4 - NOT USED - Control of Materials
- Part 5 - Pipeline System Rehabilitation [Go to Page]
- Section 500 - Pipeline, Manhole, and Structure Rehabilitation
- Part 6 -Temporary Traffic Control [Go to Page]
- Section 600 - Access
- Section 601 - Temporary Traffic Control for Construction and Maintenance Work Zones
- Part 7 - Street Lighting and Traffic Signal Systems [Go to Page]
- Section 700 - Materials
- Section 701 - Construction
- Part 8 - Landscaping and Irrigation [Go to Page]
- Section 800 - Materials
- Section 801 - Installation
- Section 802 - Native Habitat Protection, Installation, Maintenance, and Monitoring
- Part 9 - Water Works [Go to Page]
- Section 900 - Materials
- Section 901 - Installation and Connection
- Part 10 - Equal Opportunity Contracting Program (EOCP) [Go to Page]
- Section A - General Requirements
- Section B - SLBE-ELBE Subcontracting Requirements
- Index [Go to Page]