Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
ASME B30.6-2020: Derricks: Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings, 2020
- CONTENTS
- FOREWORD
- ASME B30 COMMITTEE ROSTER
- B30 STANDARD INTRODUCTION
- ASME B30.6-2020 SUMMARY OF CHANGES
- Chapter 6-0 Scope, Definitions, Translations, Personnel Competence, and References [Go to Page]
- SECTION 6-0.1: SCOPE OF B30.6
- SECTION 6-0.2: DEFINITIONS [Go to Page]
- 6-0.2.1 Types of Equipment
- 6-0.2.2 General
- SECTION 6-0.3: TECHNICAL AND SAFETY-RELATED INFORMATION
- SECTION 6-0.4: PERSONNEL COMPETENCE
- SECTION 6-0.5: REFERENCES
- Chapter 6-1 Construction and Installation [Go to Page]
- SECTION 6-1.1: LOAD RATINGS [Go to Page]
- 6-1.1.1 Basis
- 6-1.1.2 Rated Load (Working Load) Marking
- SECTION 6-1.2: CONSTRUCTION [Go to Page]
- 6-1.2.1 General
- 6-1.2.2 Guy Derricks
- 6-1.2.3 Stiffleg Derricks
- 6-1.2.4 Gin Pole Derricks
- 6-1.2.5 Chicago Boom Derricks
- SECTION 6-1.3: ROPES AND REEVING ACCESSORIES [Go to Page]
- 6-1.3.1 General
- 6-1.3.2 Guy Ropes
- 6-1.3.3 Boom Hoist Ropes
- 6-1.3.4 Load Hoist Ropes
- 6-1.3.5 Reeving Accessories
- 6-1.3.6 Sheaves
- SECTION 6-1.4: ANCHORING AND GUYING [Go to Page]
- 6-1.4.1 Guy Derricks
- 6-1.4.2 Stiffleg Derricks
- 6-1.4.3 Load-Anchoring Data
- SECTION 6-1.5: WINCHES AND SWINGERS
- SECTION 6-1.6: GENERAL REQUIREMENTS [Go to Page]
- 6-1.6.1 Guards
- 6-1.6.2 Lubrication
- 6-1.6.3 Hooks
- 6-1.6.4 Boom Angle Indicator
- 6-1.6.5 Controls Marking
- Chapter 6-2 Inspection, Testing, and Maintenance [Go to Page]
- SECTION 6-2.1: INSPECTION [Go to Page]
- 6-2.1.1 Inspection Classification
- 6-2.1.2 Frequent Inspection
- 6-2.1.3 Periodic Inspection
- 6-2.1.4 Derricks Not in Regular Use
- 6-2.1.5 Inspection Records (for Periodic Inspections)
- SECTION 6-2.2: TESTING [Go to Page]
- 6-2.2.1 Operational Tests
- 6-2.2.2 Load Test
- SECTION 6-2.3: MAINTENANCE [Go to Page]
- 6-2.3.1 Preventive Maintenance
- 6-2.3.2 Maintenance Procedure
- 6-2.3.3 Adjustments and Repairs
- 6-2.3.4 Lubrication
- SECTION 6-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE [Go to Page]
- 6-2.4.1 Inspection
- 6-2.4.2 Rope Maintenance
- Chapter 6-3 Operation [Go to Page]
- SECTION 6-3.1: QUALIFICATIONS, RESPONSIBILITIES, AND OPERATING PRACTICES [Go to Page]
- 6-3.1.1 Operators
- 6-3.1.2 Qualifications for Operators
- 6-3.1.3 Lift Planning
- SECTION 6-3.2: RESPONSIBILITIES [Go to Page]
- 6-3.2.1 Responsibilities of the Derrick Owner and Derrick User
- 6-3.2.2 Responsibilities of the Site Supervisor and Lift Director
- 6-3.2.3 Responsibilities of Derrick Operators
- 6-3.2.4 Responsibilities of Riggers
- 6-3.2.5 Responsibilities of Signalpersons
- SECTION 6-3.3: HANDLING THE LOAD [Go to Page]
- 6-3.3.1 Size of Load
- 6-3.3.2 Attaching the Load
- 6-3.3.3 Moving the Load
- 6-3.3.4 Personnel Lifting
- 6-3.3.5 Holding the Load
- 6-3.3.6 Use of Winch Heads
- 6-3.3.7 Securing Boom
- SECTION 6-3.4: SIGNALS [Go to Page]
- 6-3.4.1 Standard Signals
- 6-3.4.2 Standard Hand Signals
- 6-3.4.3 Standard Voice Signals
- 6-3.4.4 Bell or Light Signals
- 6-3.4.5 Special Signals
- 6-3.4.6 Emergency Signals
- 6-3.4.7 Instructions
- SECTION 6-3.5: MISCELLANEOUS [Go to Page]
- 6-3.5.1 Fire Extinguishers
- 6-3.5.2 Refueling
- 6-3.5.3 Derrick Operation in the Vicinity of Electric Power Lines
- 6-3.5.4 Induced Electrical Charges
- 6-3.5.5 Cab or Operating Enclosure
- Figures [Go to Page]
- Figure 6-0.2.1-1 A-Frame Derrick
- Figure 6-0.2.1-2 Basket Derrick
- Figure 6-0.2.1-3 Breast Derrick
- Figure 6-0.2.1-4 Chicago Boom Derrick
- Figure 6-0.2.1-5 Gin Pole Derrick
- Figure 6-0.2.1-6 Guy Derrick
- Figure 6-0.2.1-7 Shearleg Derrick
- Figure 6-0.2.1-8 Stiffleg Derrick
- Figure 6-3.4.2-1 Standard Hand Signals for Controlling Derricks
- Figure 6-3.5.3.1-1 Flowchart to Assist in Determination of Applicable Section of Derrick Operation Near Electric Power Lines
- Figure 6-3.5.3.1-2 Specified Clearance Around an Electric Power Line
- Figure 6-3.5.3.1-3 Electric Power Line Support Structures
- Table [Go to Page]
- Table 6-3.5.3.1-1 Specified Clearance in the Vicinity of Energized Power Lines [Go to Page]