Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
ASME B30.22 - 2016: Articulating Boom Cranes, 2016
- CONTENTS
- FOREWORD
- ASME B30 COMMITTEE ROSTER
- B30 STANDARD INTRODUCTION
- SUMMARY OF CHANGES
- Chapter 22-0 Scope, Definitions, Personnel Competence, Translations, and References [Go to Page]
- SECTION 22-0.1: SCOPE OF B30.22
- SECTION 22-0.2: DEFINITIONS [Go to Page]
- 22-0.2.1 Mounting of Articulating Boom Cranes
- 22-0.2.2 General Definitions
- SECTION 22-0.3: LEGEND FOR FIGS. 22-0.3-1 THROUGH 22-0.3-4
- SECTION 22-0.4: NOMENCLATURE FOR ARTICULATING CRANES
- SECTION 22-0.5: PERSONNEL COMPETENCE
- SECTION 22-0.6: TRANSLATIONS OF SAFETY-RELATED INFORMATION AND CONTROL DESIGNATIONS
- SECTION 22-0.7: REFERENCES
- Chapter 22-1 Construction and Characteristics [Go to Page]
- SECTION 22-1.1: LOAD RATINGS [Go to Page]
- 22-1.1.1 Load Ratings Where Stability Governs Lifting Performance
- 22-1.1.2 Load Ratings Where Factors Other Than Stability Govern Lifting Performance
- 22-1.1.3 Load Rating Charts
- SECTION 22-1.2: BOOM LIFT, BOOM TELESCOPING, AND LOAD HOIST MECHANISMS [Go to Page]
- 22-1.2.1 Inner, Outer, and Jib Boom Lift Mechanism
- 22-1.2.2 Telescoping Booms
- 22-1.2.3 Load Hoist Mechanism Load Hoist Equipped Machines Only
- SECTION 22-1.3: SWING MECHANISM [Go to Page]
- 22-1.3.1 Swing Control
- 22-1.3.2 Swing Braking Means and Locking Devices
- SECTION 22-1.4: CRANE TRANSPORT
- SECTION 22-1.5: ROPES AND REEVING ACCESSORIES [Go to Page]
- 22-1.5.1 Rope Design Factors
- 22-1.5.2 Ropes
- 22-1.5.3 Reeving Accessories
- 22-1.5.4 Sheaves
- 22-1.5.5 Sheave Sizes
- 22-1.5.6 Load Hooks, Ball Assemblies, and Load Blocks
- SECTION 22-1.6: CONTROLS [Go to Page]
- 22-1.6.1 General
- 22-1.6.2 Control Forces and Movements
- 22-1.6.3 Wireless Radio Remote Controls
- SECTION 22-1.7: INSTALLATION [Go to Page]
- 22-1.7.1 Testing
- 22-1.7.2 Exhaust Gases
- SECTION 22-1.8: CONSTRUCTION [Go to Page]
- 22-1.8.1 Welding
- 22-1.8.2 Operational Aids [Go to Page]
- 22-1.8.2.1 Two-Block Damage Prevention System or Anti-Two-Block Device.
- 22-1.8.2.2 Overload Protection Systems and Rated Capacity Limiters.
- 22-1.8.2.3 Crane Level Indicator.
- 22-1.8.3 Hydraulic and Pneumatic Line Protection
- 22-1.8.4 Lubricating Points
- 22-1.8.5 Stabilizers
- 22-1.8.6 Design Requirements
- 22-1.8.7 Miscellaneous Equipment [Go to Page]
- 22-1.8.7.1 Cabs
- 22-1.8.8 Replacement Parts
- SECTION 22-1.9: OPERATING MANUAL
- Chapter 22-2 Inspection, Testing, and Maintenance [Go to Page]
- SECTION 22-2.1: INSPECTION [Go to Page]
- 22-2.1.1 General
- 22-2.1.2 Inspection Classification
- 22-2.1.3 Frequent Inspection
- 22-2.1.4 Periodic Inspection
- 22-2.1.5 Operational Aids
- 22-2.1.6 Cranes Not in Regular Use
- SECTION 22-2.2: TESTING
- 22-2.2.1 Operational Tests
- 22-2.2.2 Load Test
- 22-2.2.3 Stability Test
- SECTION 22-2.3: MAINTENANCE
- 22-2.3.1 Preventive Maintenance
- 22-2.3.2 Maintenance Procedure
- 22-2.3.3 Adjustments, Alterations, and Repairs
- 22-2.3.4 Lubrication
- SECTION 22-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE
- 22-2.4.1 General
- 22-2.4.2 Inspection
- 22-2.4.3 Rope Replacement
- 22-2.4.4 Rope Maintenance
- Chapter 22-3 Operation [Go to Page]
- SECTION 22-3.1: QUALIFICATIONS AND RESPONSIBILITIES [Go to Page]
- 22-3.1.1 Operators
- 22-3.1.2 Qualifications for Operators
- 22-3.1.3 Responsibilities [Go to Page]
- 22-3.1.3.1 Responsibilities of the Crane Owner and Crane User. [Go to Page]
- 22-3.1.3.1.1 Responsibilities of the Crane Owner.
- 22-3.1.3.1.2 Responsibilities of the Crane User.
- 22-3.1.3.2 Responsibilities of the Site Supervisor and Lift Director. [Go to Page]
- 22-3.1.3.2.1 Responsibilities of the Site Supervisor.
- 22-3.1.3.2.2 Responsibilities of the Lift Director.
- 22-3.1.3.3 Responsibilities of Crane Operators and Riggers. [Go to Page]
- 22-3.1.3.3.1 Responsibilities of the Crane Operator.
- 22-3.1.3.3.2 RiggerŒs Responsibilities.
- SECTION 22-3.2: OPERATING PRACTICES [Go to Page]
- 22-3.2.1 Size of Load
- 22-3.2.2 Operational Aids
- 22-3.2.3 Crane Setup
- 22-3.2.4 Attaching the Load
- 22-3.2.5 Moving the Load
- 22-3.2.6 Stowing/Unstowing Procedure
- 22-3.2.7 Personnel Lifting
- 22-3.2.8 Critical Lifts
- SECTION 22-3.3: SIGNALS [Go to Page]
- 22-3.3.1 General
- 22-3.3.2 Standard Signals
- 22-3.3.3 Signalperson Qualifications
- 22-3.3.4 Standard Hand Signals
- 22-3.3.5 Standard Voice Signals
- 22-3.3.6 Special Signals
- SECTION 22-3.4 OPERATING NEAR ELECTRIC POWER LINES [Go to Page]
- 22-3.4.1 General
- 22-3.4.2 Crane Operation Near De-Energized and Grounded Electric Power Lines
- 22-3.4.3 Crane Operation: Within the Erected/Fully Extended Boom Length of the Prohibited Zone, With the Electric Power Lines Energized
- 22-3.4.4 Crane Operation Within the Prohibited Zone With the Electric Power Lines Energized
- 22-3.4.5 Operations in Transit With No Load and Boom Lowered
- How can you reach us? ItŒs easier than ever!
- FIGURES [Go to Page]
- Fig. 22-0.2.1-1 Commercial Truck-Mounted With Ground Control
- Fig. 22-0.2.1-2 Commercial Truck-Mounted With Top Seat Control
- Fig. 22-0.2.1-3 Commercial Truck-Rear-Mounted With Remote Control
- Fig. 22-0.2.1-4 Crawler-Mounted
- Fig. 22-0.2.1-5 Stationary Installation
- Fig. 22-0.2.1-6 Railcar Installation
- Fig. 22-0.2.1-7 Trailer-Mounted
- Fig. 22-0.2.1-8 Traveling Base-Mounted on Trailer
- Fig. 22-0.2.1-9 Off-Road Vehicle
- Fig. 22-0.3-1 Definitions of Specifications for Articulating Cranes
- Fig. 22-0.3-2 Hook Approach
- Fig. 22-0.3-3 Elevation Below Horizontal
- Fig. 22-0.3-4 Elevation Above Horizontal
- Fig. 22-0.4-1 Nomenclature for Articulating Cranes
- Fig. 22-1.1.3-1 Work Areas
- Fig. 22-2.4.2-1 Core Failure in 19 � 7 Rotation-Resistant Rope
- Fig. 22-3.3.4-1 Standard Hand Signals
- Fig. 22-3.4.1-1 Danger Zone for Cranes and Lifted Loads Operating Near Electrical Transmission Lines
- Table [Go to Page]
- Table 22-3.4.2-1 Required Clearance for Normal Voltage in Operation Near High Voltage Power Lines and Operation in Transit With No Load and Boom or Mast Lowered [Go to Page]