Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
B30.10 Hooks, 2014
- CONTENTS
- FOREWORD
- ASME B30 COMMITTEE ROSTER
- B30 STANDARD INTRODUCTION [Go to Page]
- SECTION I: SCOPE
- SECTION II: SCOPE EXCLUSIONS
- SECTION III: PURPOSE
- SECTION IV: USE BY REGULATORY AGENCIES
- SECTION V: EFFECTIVE DATE
- SECTION VI: REQUIREMENTS AND RECOMMENDATIONS
- SECTION VII: USE OF MEASUREMENT UNITS
- SECTION VIII: REQUESTS FOR REVISION
- SECTION IX: REQUESTS FOR INTERPRETATION
- SECTION X: ADDITIONAL GUIDANCE
- ASME B30.10-2014 SUMMARY OF CHANGES
- Chapter 10-0 Scope, Definitions, References, Personnel Competence, and Translations [Go to Page]
- SECTION 10-0.1: SCOPE OF ASME B30.10
- SECTION 10-0.2: DEFINITIONS
- SECTION 10-0.3: REFERENCES
- SECTION 10-0.4: PERSONNEL COMPETENCE
- SECTION 10-0.5: TRANSLATIONS
- Chapter 10-1 Hooks: Selection, Use, and Maintenance [Go to Page]
- SECTION 10-1.1: SCOPE
- SECTION 10-1.2: TRAINING
- SECTION 10-1.3: MATERIALS AND COMPONENTS
- SECTION 10-1.4: FABRICATION AND CONFIGURATIONS
- SECTION 10-1.5: DESIGN FACTOR
- SECTION 10-1.6: RATED LOADS
- SECTION 10-1.7: PROOF TEST REQUIREMENTS
- SECTION 10-1.8: IDENTIFICATION
- SECTION 10-1.9: EFFECTS OF ENVIRONMENT
- SECTION 10-1.10: INSPECTION, REMOVAL, AND REPAIR
- SECTION 10-1.11: OPERATING PRACTICES
- Chapter 10-2 Hooks -- Miscellaneous: Selection, Use, and Maintenance [Go to Page]
- SECTION 10-2.1: SCOPE
- SECTION 10-2.2: TRAINING
- SECTION 10-2.3: MATERIALS AND COMPONENTS
- SECTION 10-2.4: FABRICATION AND CONFIGURATIONS
- SECTION 10-2.5: DESIGN FACTOR
- SECTION 10-2.6: RATED LOADS
- SECTION 10-2.7: PROOF TEST REQUIREMENTS
- SECTION 10-2.8: IDENTIFICATION
- SECTION 10-2.9: EFFECTS OF ENVIRONMENT
- SECTION 10-2.10: INSPECTION, REMOVAL, AND REPAIR
- SECTION 10-2.11: OPERATING PRACTICES
- Figures [Go to Page]
- Fig. 10-1.1-1 Clevis Hook (Latch — When Required)
- Fig. 10-1.1-2 Eye Hook (Latch — When Required)
- Fig. 10-1.1-3 Shank Hook (Latch — When Required)
- Fig. 10-1.1-4 Duplex Hook (Sister) (Latch — When Required)
- Fig. 10-1.1-5 Articulated Duplex Hook (Sister) (Latch — When Required)
- Fig. 10-1.1-6 Self-Locking Eye Hook (Open)
- Fig. 10-1.1-7 Self-Locking Clevis Hook (Closed)
- Fig. 10-1.1-8 Self-Closing Bail (Eye Hook)
- Fig. 10-1.1-9 Self-Closing Gate Latch (Shank Hook)
- Fig. 10-1.1-10 Self-Closing Flapper Latch (Shank Hook)
- Fig. 10-1.1-11 Self-Closing Flapper Latch (Swivel Hook)
- Fig. 10-1.1-12 Self-Closing Flipper Latch (Eye Hook)
- Fig. 10-1.1-13 Self-Closing Tiplock Latch (Shank Hook)
- Fig. 10-1.1-14 Self-Closing Tiplock Latch (Eye Hook)
- Fig. 10-1.1-15 Single Plate Hook
- Fig. 10-1.1-16 Laminated Plate Hook
- Fig. 10-1.1-17 Quad Hook (Latch — When Required)
- Fig. 10-2.1-1 Eye Grab Hook
- Fig. 10-2.1-2 Clevis Grab Hook
- Fig. 10-2.1-3 Foundry Hook
- Fig. 10-2.1-4 Sorting Hook
- Fig. 10-2.1-5 Choker Hook
- Fig. 10-2.1-6 Clevis Foundry Hook
- Table [Go to Page]
- Table 10-1.7-1 Proof Test Load
- ASME B30.10-2014 INTERPRETATIONS [Go to Page]
- Interpretation: 10-20
- How can you reach us? ItÅ’s easier than ever! [Go to Page]