ASHRAE Guideline 1.1 HVAC&R Technical Requirements for The Commissioning Process , 2007
- FOREWORD
- Index to Annexes
- Annex A—Guide for Developing Supplementary Technical Guidelines for the Commissioning Process.
- Annex B—Commissioning Process Flowchart
- Annex C—Cost and Benefits of the Commissioning Process
- Annex D—Commissioning Process Documentation Matrix
- Annex E—Commissioning Process Request for Qualifications
- Annex F—Roles and Responsibilities
- Annex G—Commissioning Plan
- Annex H—Acceptance Plan
- Annex I—Owner’s Project Requirements Workshop Guidance
- Annex J—Owner’s Project Requirements
- Annex K—Basis of Design
- Annex L—Specifications
- Annex M—Construction Checklists
- Annex N—Quality-Based Sampling Examples
- Annex O—Systems Manual
- Annex P—Training Manual and Training Needs
- Annex Q—Publications, Articles, References, Codes, Regulations, and Standards
- Annex R—Integration Requirements
- Annex S—Interference and Coordination with Other Systems and Assemblies
- Annex T—Communications: What, When, and Who
- Annex U—Test Procedures and Data Forms
- Annex V—Pre-Design Phase Commissioning Process Specific Needs
- Annex W—Design Phase Commissioning Process Specific Needs
- Annex X—Construction Phase Commissioning Process Specific Needs
- Annex Y—Occupancy and Operations Phase Commissioning Process Specific Needs
- INFORMATIVE ANNEX G COMMISSIONING PLAN
- Table of Contents
- Supplemental Information—Appendix Index
- Commissioning Plan Overview
- Commissioning Process Description
- Pre-Design Phase
- Develop Owner’s Project Requirements
- Develop Initial Commissioning Plan
- Track Commissioning Process Issues
- Design Phase
- Review and Modify Project Specifications
- Verify Basis of Design
- Update Commissioning Plan
- Accomplish Design Reviews
- General Review
- Coordination Review
- Field Specific Review
- Specification and Other Documentation Review
- Design Review Comments
- Develop Commissioning Process Contract Document Requirements
- Attend Pre-Bid Meeting
- Construction Phase
- Conduct Pre-Construction Meeting
- Perform Contractor Submittal Review
- Verify Construction Checklists
- Review Training
- Complete Testing
- Occupancy and Operations Phase
- Final Commissioning Process Report
- Seasonal Testing
- Ongoing Training
- Warranty Review
- Lessons-Learned Meeting
- Contact Information
- Schedule Requirements
- SUPPLEMENTAL INFORMATION—iNDEX
- Appendix A—Owner’s Project Requirements
- Appendix B—Basis of Design
- Appendix C—Project Specifications
- Appendix D—Communication Structures
- Appendix E—Roles and Responsibilities
- Appendix F—Commissioned Systems
- Appendix G—Commissioning Process Schedule
- Appendix H—Bid Meeting
- Appendix I—Pre-Construction Meeting
- Appendix J—Design Submittal Review Criteria
- Appendix K—Submittal Review
- Appendix L—Commissioning Process Issues
- Appendix M—Construction Checklists
- Appendix N—Systems Manual
- Appendix O—Tests
- Appendix P—Training
- Appendix Q—Meeting Minutes
- Appendix R—Correspondence
- Appendix S—Warranty Review
- Appendix T—Lessons Learned
- Appendix A—Owner’s Project Requirements
- Appendix B—Basis of Design
- Appendix C—Project Specifications
- Appendix D—Communication Structures
- Appendix E—Roles and Responsibilities
- Team Members
- General Management Plan
- General Descriptions of Roles
- Appendix F—Commissioned Systems
- Appendix G—Commissioning Process Schedule
- Appendix H—Bid Meeting
- COMMISSIONING ISSUES/BENEFITS LOG
- Appendix M – Construction Checklists
- Appendix N – Systems Manual
- Appendix O – Tests
- Appendix P– Training
- Appendix Q– Meeting Minutes
- Appendix R – Correspondence
- Appendix S – Warranty Review
- Appendix T – Lessons Learned
- INFORMATIVE ANNEX H Acceptance Plan
- Pre-Design Phase
- Design Phase
- Construction Phase
- Occupancy and Operations Phase
- INFORMATIVE ANNEX I Owner’s Project Requirements Workshop Guidance
- INFORMATIVE ANNEX J OWNER’S PROJECT REQUIREMENTS
- New ASHRAE Headquarters Facility
- Introduction
- Key Owner’s Project Requirements
- General Project Description
- Objectives
- Functional Uses
- Occupancy Requirements
- TABLE 1 Occupancy Schedule
- Budget Considerations and Limitations
- Performance Criteria
- Owner’s Project Requirements Version History
- OPR Workshop Responses
- INFORMATIVE ANNEX K BASIS OF DESIGN
- INFORMATIVE ANNEX L— SPECIFICATIONS
- PART 1—GENERAL
- PART 2—PRODUCTS (Not Used)
- PART 3—EXECUTION
- INFORMATIVE ANNEX M— EXAMPLE CHECKLISTS
- Index of Example Checklists
- 1. Pre-Design Checklist: Mechanical Second Review (As part of the Programming Architect’s Second Review Submittal) ASHRAE Guideline 1.1 Example Checklist
- 2. Design Checklist for the Mechanical Engineer’s First Design Submittal ASHRAE Guideline 1.1 Example Checklist
- 3. Air Handling Unit, CW & HW: AHU-1 ASHRAE Guideline 1.1 Example Checklist
- 4. Boiler, Hot Water: B-1 ASHRAE Guideline 1.1 Example Checklist
- 5. Centrifugal Chiller: C-1 ASHRAE Guideline 1.1 Example Checklist
- 6. Cooling Tower: CT-1 ASHRAE Guideline 1.1 Example Checklist
- 7. Coil, HW Heat: HWC-1 ASHRAE Guideline 1.1 Example Checklist
- 8A. HVAC Piping: Insulation ASHRAE Guideline 1.1 Example Checklist
- 8B. HVAC Piping: Insulation – Daily Checklist ASHRAE Guideline 1.1 Example Checklist
- 9A. Ductwork: Installation ASHRAE Guideline 1.1 Example Checklist
- 9B. Ductwork: Installation – Daily Checklist ASHRAE Guideline 1.1 Example Checklist
- 10A. Ductwork: Insulation ASHRAE Guideline 1.1 Example Checklist
- 10B. Ductwork: Insulation – Daily Checklist ASHRAE Guideline 1.1 Example Checklist
- 11. Energy Recovery Wheel: ERW-1 ASHRAE Guideline 1.1 Example Checklist
- 12. Exhaust Fan: EF-1 ASHRAE Guideline 1.1 Example Checklist
- 13. Fan Coil Unit, CW & HW: FCU-1 ASHRAE Guideline 1.1 Example Checklist
- 14. Fire Damper: FD-1 ASHRAE Guideline 1.1 Example Checklist
- 15. Grilles, Registers & Diffusers: Diffusers ASHRAE Guideline 1.1 Example Checklist
- 16. Humidifier, Steam: SH-1 ASHRAE Guideline 1.1 Example Checklist
- 17. HVAC Piping: Installation ASHRAE Guideline 1.1 Example Checklist
- 18. VAV Box, Non Fan Powered w/HW Heat: VAV-1 ASHRAE Guideline 1.1 Example Checklist
- 19. Pump, HVAC: P-1 ASHRAE Guideline 1.1 Example Checklist
- 20. Split System A/C Unit (coil portion): ACE-1 ASHRAE Guideline 1.1 Example Checklist
- 21. Split System A/C Unit (compressor portion): ACC-1 ASHRAE Guideline 1.1 Example Checklist
- 22. Unit Heater, HW: UH-1 ASHRAE Guideline 1.1 Example Checklist
- 23. Variable Speed Drive: VSD-1 ASHRAE Guideline 1.1 Example Checklist
- 24. VAV Box, Fan Powered w/ Elect Heat: FPVAV-1 ASHRAE Guideline 1.1 Example Checklist
- 25. Operations and Maintenance: Energy Efficiency Checklist (A copy is to be completed on the 18th of each month beginning in [Month] [Year] through [Month] [Year], the end of the initial commissioning process implementation for this building) ASHRAE...
- INFORMATIVE ANNEX N— QUALITY-BASED SAMPLING EXAMPLES
- Introduction
- Submittal Reviews
- Site Visits
- Final Commissioning Process Testing
- INFORMATIVE ANNEX O—SYSTEMS MANUAL
- SYSTEMS MANUAL ASHRAE HEADQUARTERS FACILITY HVAC&R SYSTEMS
- INFORMATIVE ANNEX P— TRAINING MANUAL AND TRAINING NEEDS
- Pre-Design Phase
- Design Phase
- Contractor Special Training, Licensing, Certification (Construction Phase)
- Construction Phase Training
- Construction Phase Close Out:
- Occupancy and Occupancy Phase:
- Summary:
- INFORMATIVE ANNEX Q— PUBLICATIONS, ARTICLES, REFERENCES, CODES, REGULATIONS, AND STANDARDS
- Preparing for the Commissioning Process
- Pre-Design Phase
- Design Phase
- Construction Phase
- Occupancy and Operations Phase
- INFORMATIVE ANNEX R— INTEGRATION REQUIREMENTS
- System Integration Concerns (from NIBS Guideline 3)
- ANNEX R from NIBS Guideline 3-2006
- INFORMATIVE ANNEX S— INTERFERENCE AND COORDINATION WITH OTHER SYSTEMS AND ASSEMBLIES
- Figure S-1 Typical interdisciplinary coordination and ceiling section detail on drawings.
- INFORMATIVE ANNEX T— COMMUNICATIONS: WHAT, WHEN, AND WHO
- INFORMATIVE ANNEX U— TEST PROCEDURES AND DATA FORMS
- Comfort OPR Commissioning Process Test Procedure [Go to Page]