Cart (0)
  • No items in cart.
Total
$0
There is a technical issue about last added item. You can click "Report to us" button to let us know and we resolve the issue and return back to you or you can continue without last item via click to continue button.
Search book title
Enter keywords for book title search
Search book content
Enter keywords for book content search
Filters:
FORMAT
BOOKS
PACKAGES
EDITION
to
PUBLISHER
(1)
(317)
(572)
(43)
(234)
(969)
(643)
(2114)
(64)
(91921)
(54)
(535)
(117)
(31)
(20)
(19)
(92811)
(3)
(17)
(1)
(351)
(300)
(6023)
(239)
(16)
(5)
(1621)
(16)
(18)
(28)
(4)
 
(6)
(7)
(115)
(3)
(57)
(5)
(5)
(1)
(1)
(2)
(23)
(26)
(27)
(13)
(61)
(24)
(22)
(7)
(8)
(20)
(1)
(3)
(50)
(6)
(31)
CONTENT TYPE
 Act
 Admin Code
 Announcements
 Bill
 Book
 CADD File
 CAN
 CEU
 Charter
 Checklist
 City Code
 Code
 Commentary
 Comprehensive Plan
 Conference Paper
 County Code
 Course
 DHS Documents
 Document
 Errata
 Executive Regulation
 Federal Guideline
 Firm Content
 Guideline
 Handbook
 Interpretation
 Journal
 Land Use and Development
 Law
 Legislative Rule
 Local Amendment
 Local Code
 Local Document
 Local Regulation
 Local Standards
 Manual
 Model Code
 Model Standard
 Notice
 Ordinance
 Other
 Paperback
 PASS
 Periodicals
 PIN
 Plan
 Policy
 Product
 Program
 Provisions
 Requirements
 Revisions
 Rules & Regulations
 Standards
 State Amendment
 State Code
 State Manual
 State Plan
 State Standards
 Statute
 Study Guide
 Supplement
 Technical Bulletin
 All
  • BSI
    PD IEC TS 63102:2021 Grid code compliance assessment methods for grid connection of wind and PV power plants
    Edition: 2021
    $418.55
    / user per year

Description of PD IEC TS 63102:2021 2021

This technical specification highlights recommended technical methods of grid code compliance assessment for grid connection of wind and PV power plants as the basic components of grid connection evaluation. The electrical behaviour of wind and PV power plants in this technical specification includes frequency and voltage range, reactive power capability, control performance including active power based control and reactive power based control, fault ride through capability and power quality.

Compliance assessment is the process of determining whether the electrical behaviour of wind and PV power plants meets specific technical requirements in grid codes or technical regulations. The assessment methods include compliance testing, compliance simulation and compliance monitoring. The input for compliance assessment includes relevant supporting documents, testing results and validated simulation models, and continuous monitoring data. The scope of this technical specification only covers assessment methods from a technical aspect; processes related to certification are not included.

This technical specification is applicable to wind and PV power plants connected to the electrical power grid.



About BSI

BSI Group, also known as the British Standards Institution is the national standards body of the United Kingdom. BSI produces technical standards on a wide range of products and services and also supplies certification and standards-related services to businesses.

X