Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
ASME BPVC-XI-2 - 2019 - BPVC Section XI-Rules for Inservice Inspection of Nuclear Power Plant Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants, 2019
- TABLE OF CONTENTS
- List of Sections [Go to Page]
- INTERPRETATIONS
- CODE CASES
- Foreword
- Statement of Policy on the Use of the ASME Single Certification Mark and Code Authorization in Advertising
- Statement of Policy on the Use of ASME Marking to Identify Manufactured Items
- Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees [Go to Page]
- 1 INTRODUCTION
- 2 INQUIRY FORMAT
- 3 CODE REVISIONS OR ADDITIONS
- 4 CODE CASES
- 5 CODE INTERPRETATIONS
- 6 SUBMITTALS
- Personnel
- Preface to Section XI [Go to Page]
- INTRODUCTION
- GENERAL
- INSERVICE TESTING OF PUMP AND VALVES
- OWNER RESPONSIBILITIES
- DUTIES OF THE AUTHORIZED NUCLEAR INSERVICE INSPECTOR
- Organization of Section XI [Go to Page]
- 1 DIVISIONS
- 2 ORGANIZATION OF DIVISION 1
- 3 ORGANIZATION OF DIVISION 2
- 4 REFERENCES
- Cross-Referencing and Stylistic Changes in the Boiler and Pressure Vessel Code [Go to Page]
- Subparagraph Breakdowns/Nested Lists Hierarchy
- Footnotes
- Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees
- Cross-References
- ARTICLE RIM-1 SCOPE AND RESPONSIBILITY [Go to Page]
- RIM-1.1 SCOPE
- RIM-1.2 JURISDICTION
- RIM-1.3 COMPONENTS SUBJECT TO THE REQUIREMENTS OF THIS DIVISION
- RIM-1.4 OWNER’S RESPONSIBILITY
- RIM-1.5 STANDARD UNITS
- RIM-1.6 INSPECTION [Go to Page]
- RIM-1.6.1 Duties of the Inspector
- RIM-1.6.2 Qualification of Authorized Inspection Agencies, Inspectors, and Supervisors
- RIM-1.6.3 Access for Inspector
- RIM-1.7 REGULATORY REVIEW
- RIM-1.8 TOLERANCES
- RIM-1.9 REFERENCED STANDARDS AND SPECIFICATIONS
- ARTICLE RIM-2 RELIABILITY AND INTEGRITY MANAGEMENT (RIM) PROGRAM [Go to Page]
- RIM-2.1 RIM PROGRAM OVERVIEW [Go to Page]
- RIM-2.1.1 Basis, Objective, and Process
- RIM-2.1.2 Responsibilities
- RIM-2.2 RIM PROGRAM SCOPE AND DEFINITION
- RIM-2.3 DEGRADATION MECHANISM ASSESSMENT (DMA)
- RIM-2.4 PLANT AND SSC RELIABILITY TARGET ALLOCATION [Go to Page]
- RIM-2.4.1 Plant-Level Risk and Reliability Targets
- RIM-2.4.2 SSC-Level Reliability Target
- RIM-2.4.3 Scope, Level of Detail, and Technical Adequacy of the PRA
- RIM-2.5 IDENTIFICATION AND EVALUATION OF RIM STRATEGIES [Go to Page]
- RIM-2.5.1 Identification of RIM Strategies
- RIM-2.5.2 Evaluation of RIM Strategy Impacts on SSC Reliability
- RIM-2.6 EVALUATION OF UNCERTAINTIES
- RIM-2.7 RIM PROGRAM IMPLEMENTATION [Go to Page]
- RIM-2.7.1 RIM Program Documentation
- RIM-2.7.2 Inspection Interval
- RIM-2.7.3 Preservice Inspection
- RIM-2.7.4 Design Requirements for RIM
- RIM-2.7.5 Leak Detection System Requirements for RIM
- RIM-2.7.6 Examination and Inspection Requirements for RIM
- RIM-2.7.7 Examination Methods and Volumes
- RIM-2.8 PERFORMANCE MONITORING AND RIM PROGRAM UPDATES
- RIM-2.9 EXAMINATION METHODS [Go to Page]
- RIM-2.9.1 Visual Examinations
- RIM-2.9.2 Surface Examination
- RIM-2.9.3 Volumetric Examination
- RIM-2.9.4 Alternative Examinations
- RIM-2.10 ADDITIONAL CONSIDERATIONS FOR RIM PROGRAM IMPLEMENTATION [Go to Page]
- RIM-2.10.1 Consequence, External Event, and Shutdown Considerations
- RIM-2.10.2 Principles of Risk-Informed Decision Making
- ARTICLE RIM-3 ACCEPTANCE STANDARDS [Go to Page]
- RIM-3.1 EVALUATION OF EXAMINATION RESULTS AND ACCEPTANCE STANDARDS
- ARTICLE RIM-4 REPAIR/REPLACEMENT ACTIVITIES [Go to Page]
- RIM-4.1 SCOPE
- RIM-4.2 LEAK TEST REQUIREMENTS AFTER A REPAIR/REPLACEMENT ACTIVITY [Go to Page]
- RIM-4.2.1 Test Boundaries
- RIM-4.2.2 Gas Leak Test
- RIM-4.2.3 Liquid Leak Test
- RIM-4.2.4 Volumetric and Surface Examination
- RIM-4.2.5 Exemptions
- RIM-4.3 RESPONSIBILITIES
- RIM-4.4 CORRECTIVE ACTION
- RIM-4.5 RECORDS
- ARTICLE RIM-5 SYSTEM LEAK MONITORING AND PERIODIC TESTS [Go to Page]
- RIM-5.1 SCOPE
- RIM-5.2 LEAKAGE MONITORING [Go to Page]
- RIM-5.2.1 General
- RIM-5.2.2 Periodic Leak Test
- RIM-5.3 CORRECTIVE ACTION
- RIM-5.4 RECORDS
- ARTICLE RIM-6 RECORDS AND REPORTS [Go to Page]
- RIM-6.1 SCOPE
- RIM-6.2 REQUIREMENTS [Go to Page]
- RIM-6.2.1 Owner’s Responsibilities
- RIM-6.2.2 Owner Activity Report, Form OAR-1
- RIM-6.2.3 Contracted Repair/Replacement Organization Responsibilities
- RIM-6.2.4 Owners’ Repair/Replacement Certification Record NIS-2 Responsibilities
- RIM-6.3 RETENTION [Go to Page]
- RIM-6.3.1 Maintenance of Records
- RIM-6.3.2 Reproduction, Digitization, and Microfilming
- RIM-6.3.3 Construction Records
- RIM-6.3.4 RIM Program Records
- RIM-6.3.5 Repair/Replacement Activity Records
- ARTICLE RIM-7 GLOSSARY [Go to Page]
- RIM-7.1 TERMS AND DEFINITIONS
- MANDATORY APPENDIX I RIM DECISION FLOWCHARTS FOR USE WITH THE RIM PROGRAM [Go to Page]
- ARTICLE I-1 FLOWCHARTS [Go to Page]
- I-1.1 GENERAL
- MANDATORY APPENDIX II DERIVATION OF COMPONENT RELIABILITY TARGETS FROM PLANT SAFETY REQUIREMENTS [Go to Page]
- ARTICLE II-1 GENERAL REQUIREMENTS [Go to Page]
- II-1.1 SCOPE
- II-1.2 ADEQUACY OF THE PRA
- II-1.3 PROCEDURE OVERVIEW
- ARTICLE II-2 RELIABILITY TARGET DERIVATION [Go to Page]
- II-2.1 PLANT-LEVEL SAFETY REQUIREMENTS
- II-2.2 ALLOCATION OF RELIABILITY TARGETS
- II-2.3 IDENTIFICATION OF COMPONENT GROUPS
- II-2.4 TRIAL ASSIGNMENT OF RELIABILITY TARGETS
- II-2.5 EVALUATION OF IMPACTS OF RELIABILITY TARGETS ON PLANT-LEVEL RISK
- II-2.6 DETERMINATION OF RELIABILITY TARGETS
- MANDATORY APPENDIX III OWNER’S RECORD AND REPORT FOR RIM PROGRAM ACTIVITIES [Go to Page]
- ARTICLE III-1 GUIDES TO COMPLETING FORMS [Go to Page]
- III-1.1 FORM OAR-1
- III-1.2 FORM NIS-2
- MANDATORY APPENDIX IV MONITORING AND NDE QUALIFICATION [Go to Page]
- ARTICLE IV-1 INTRODUCTION [Go to Page]
- IV-1.1 SCOPE
- IV-1.2 METHODS
- IV-1.3 OWNER’S REQUIREMENTS
- ARTICLE IV-2 PROCEDURES, EQUIPMENT, AND PERSONNEL REQUIREMENTS [Go to Page]
- IV-2.1 BASIC QUALIFICATION (FIGURES I-1.1-1 THROUGH I-1.1-7)
- IV-2.2 METHOD/TECHNIQUE PERSONNEL-SPECIFIC QUALIFICATIONS
- ARTICLE IV-3 RELIABILITY-BASED QUALIFICATION OF MONITORING AND NDE (MANDE) METHODS AND TECHNIQUES [Go to Page]
- IV-3.1 GENERAL
- IV-3.2 DETERMINATION OF THE QUALIFICATION REQUIREMENTS
- IV-3.3 QUALIFICATION PROCESS
- ARTICLE IV-4 PERFORMANCE DEMONSTRATIONS FOR MANDE PERSONNEL (FIGURE I-1.1-6) [Go to Page]
- IV-4.1 GENERAL
- IV-4.2 PERFORMANCE DEMONSTRATION FOR PERSONNEL FOR MONITORING METHODS
- IV-4.3 PERFORMANCE DEMONSTRATION FOR NDE PERSONNEL
- ARTICLE IV-5 RECORDS [Go to Page]
- IV-5.1 GENERAL
- IV-5.2 RECORDS FOR METHODS AND TECHNIQUE QUALIFICATION
- IV-5.3 RECORDS FOR PERSONNEL PERFORMANCE DEMONSTRATIONS
- MANDATORY APPENDIX V CATALOG OF NDE REQUIREMENTS AND AREAS OF INTEREST [Go to Page]
- ARTICLE V-1 TABLES [Go to Page]
- V-1.1 GENERAL
- MANDATORY APPENDIX VI RELIABILITY AND INTEGRITY MANAGEMENT EXPERT PANEL (RIMEP) [Go to Page]
- ARTICLE VI-1 OVERVIEW [Go to Page]
- VI-1.1 RESPONSIBILITIES AND QUALIFICATIONS OF RIMEP
- MANDATORY APPENDIX VII SUPPLEMENTS FOR TYPES OF NUCLEAR PLANTS [Go to Page]
- ARTICLE VII-1 SUPPLEMENT FOR LIGHT WATER REACTOR–TYPE PLANTS [Go to Page]
- VII-1.1 SCOPE
- VII-1.2 RIM PROGRAM — DAMAGE DEGRADATION ASSESSMENT
- VII-1.3 ACCEPTANCE STANDARDS
- VII-1.4 ACCEPTANCE STANDARDS FOR SPECIFIC EXAMINATION CATEGORIES
- VII-1.5 ANALYTICAL EVALUATION OF PLANAR FLAWS
- VII-1.6 ANALYTICAL EVALUATION OF PLANT OPERATING EVENTS
- ARTICLE VII-2 SUPPLEMENT FOR LIQUID METAL REACTOR–TYPE PLANTS
- ARTICLE VII-3 SUPPLEMENT FOR HIGH-TEMPERATURE GAS REACTOR–TYPE PLANTS [Go to Page]
- VII-3.1 SCOPE
- VII-3.2 RIM PROGRAM — DAMAGE DEGRADATION ASSESSMENT
- VII-3.3 ACCEPTANCE STANDARDS
- VII-3.4 ACCEPTANCE STANDARDS FOR SPECIFIC EXAMINATION CATEGORIES
- VII-3.5 ANALYTICAL EVALUATION OF PLANAR FLAWS
- VII-3.6 ANALYTICAL EVALUATION OF PLANT OPERATING EVENTS
- ARTICLE VII-4 SUPPLEMENT FOR MOLTEN SALT REACTOR–TYPE PLANTS
- ARTICLE VII-5 SUPPLEMENT FOR GENERATION 2 LWR REACTOR–TYPE PLANTS
- ARTICLE VII-6 SUPPLEMENT FOR FUSION MACHINE–TYPE PLANTS
- NONMANDATORY APPENDIX A ALTERNATE REQUIREMENTS FOR NDE AND MONITORING [Go to Page]
- ARTICLE A-1 GENERAL [Go to Page]
- A-1.1 SCOPE
- A-1.2 METHODS
- A-1.3 RESPONSIBILITIES
- ARTICLE A-2 PROCEDURE [Go to Page]
- A-2.1 OVERVIEW
- A-2.2 SSC RELIABILITY TARGET
- A-2.3 DEGRADATION MECHANISMS AND FAILURE MODES
- A-2.4 APPROACHES — PROBABILISTIC AND DETERMINISTIC
- ARTICLE A-3 STAGE I EVALUATION [Go to Page]
- A-3.1 INTRODUCTION
- A-3.2 INPUT RELATED TO SAFETY EVALUATION
- A-3.3 INPUT RELATED TO STRUCTURAL EVALUATION
- A-3.4 PROBABILISTIC APPROACH — RELIABILITY EVALUATION
- A-3.5 DETERMINISTIC APPROACH — MARGIN ASSESSMENT
- ARTICLE A-4 STAGE II EVALUATION [Go to Page]
- A-4.1 INTRODUCTION
- A-4.2 INPUT RELATED TO SAFETY EVALUATION
- A-4.3 INPUT RELATED TO STRUCTURAL EVALUATION
- A-4.4 DETECTABILITY
- A-4.5 CRITERIA TO ESTABLISH ADDITIONAL REQUIREMENTS
- A-4.6 PROBABILISTIC APPROACH
- A-4.7 DETERMINISTIC APPROACH
- ARTICLE A-5 PROCEDURE FOR STRUCTURAL RELIABILITY EVALUATION FOR PASSIVE COMPONENTS [Go to Page]
- A-5.1 GENERAL REQUIREMENTS
- A-5.2 RELIABILITY EVALUATION
- A-5.3 FAILURE SCENARIO SETTING
- A-5.4 MODELING
- A-5.5 RELIABILITY CALCULATION
- ARTICLE A-6 RECORDS AND REPORT [Go to Page]
- A-6.1 RETENTION OF RECORDS AND REPORTS
- ARTICLE A-7 REFERENCES
- NONMANDATORY APPENDIX B REGULATORY ADMINISTRATIVE PROVISIONS FOR NUCLEAR PLANTS USING RIM PROGRAM [Go to Page]
- ARTICLE B-1 GENERAL REQUIREMENTS [Go to Page]
- B-1.1 SCOPE
- B-1.2 APPLICATION OF CODE EDITION
- B-1.3 APPLICATION OF CODE CASES
- B-1.4 REVIEW BY REGULATORY AND ENFORCEMENT AUTHORITIES HAVING JURISDICTION AT THE PLANT SITE
- B-1.5 SUMMARY OF REPORT SUBMITTAL
- ARTICLE B-2 REQUIREMENTS FOR PASSIVE COMPONENTS IN THE RIM PROGRAM [Go to Page]
- B-2.1 REVIEW BY REGULATORY AND ENFORCEMENT AUTHORITIES HAVING JURISDICTION AT THE PLANT SITE
- Figures [Go to Page]
- Figure I-1.1-1 Conceptual Framework for RIM Program
- Figure I-1.1-2 MANDE Selection Overview
- Figure I-1.1-3 MANDE Selection Process
- Figure I-1.1-4 MANDEEP Performance-Based Process
- Figure I-1.1-5 MANDE Selection When Section XI, Division 1 Is Used
- Figure I-1.1-6 Qualification Process for MANDE
- Figure I-1.1-7 Process for Evaluating Which SSCs to Include in RIM Program and Redesign Process
- Figure A-1.2-1 Logic Flow Diagram of the Process
- Figure A-5.2.1-1 Reliability Evaluation Procedure
- Figure A-5.3.1-1 Failure Scenario Setting Procedure
- Figure A-5.4.1-1 Modeling Procedure
- Tables [Go to Page]
- Table RIM-1.9-1 Referenced Standards and Specifications
- Table III-1.1-1 Guide for Completing Form OAR-1
- Table V-1.1-1 Examination Category A, Pressure-Retaining Welds in Reactor Vessels
- Table V-1.1-2 Examination Category B, Pressure-Retaining Welds in Vessels Other Than Reactor Vessels
- Table V-1.1-3 Examination Category D, Full-Penetration Welded Nozzles in Vessels
- Table V-1.1-4 Examination Category F, Pressure-Retaining Dissimilar Welds in Vessel Nozzles
- Table V-1.1-5 Examination Category G-1, Pressure-Retaining Bolting Greater Than 2 in. (50 mm) in Diameter
- Table V-1.1-6 Examination Category G-2, Pressure-Retaining Bolting 2 in. (50 mm) or Less in Diameter
- Table V-1.1-7 Examination Category J, Pressure-Retaining Welds in Piping
- Table V-1.1-8 Examination Category K, Welded Attachments for Vessels, Piping, Rotating Equipment, and Valves
- Table V-1.1-9 Examination Category L-2, Pump Casings; Examination Category M-2, Valve Bodies
- Table V-1.1-10 Examination Category N-1, Interior of Reactor Vessels; Examination Category N-2, Welded Core Support Structures and Interior Attachments to Reactor Vessels; Examination Category N-3, Removable Core Support Structures
- Table V-1.1-11 Examination Category O, Pressure-Retaining Welds in Control Rod Drive and Instrument Nozzle Housings
- Table V-1.1-12 Examination Category P, All Pressure-Retaining Components
- Table V-1.1-13 Examination Category F-A, Supports
- Table VII-1.2-1 Degradation Mechanism Attributes and Attribute Criteria (LWR)
- Table VII-1.3.3-1 Acceptance Standards
- Table VII-3.2-1 Degradation Mechanism Attributes and Attribute Criteria
- Table VII-3.3.3-1 Acceptance Standards
- ENDNOTES [Go to Page]