Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
National Electrical Safety Code 2007 Edition, 2006
- C2-2007
- National Electrical Safety Code
- Foreword
- Standards Committee Membership
- Contents
- Letter symbols for units
- Section 1. Introduction to the National Electrical Safety Code [Go to Page]
- 010. Purpose
- 011. Scope
- 012. General rules
- 013. Application
- 014. Waiver
- 015. Intent
- 016. Effective date
- 017. Units of measure
- 018. Method of calculation
- Part 1. Rules for the Installation and Maintenance of Electric Supply Stations and Equipment
- Section 10. Purpose and scope of rules [Go to Page]
- 100. Purpose
- 101. Scope
- 102. Application of rules
- 103. Referenced sections
- Section 11. Protective arrangements in electric supply stations [Go to Page]
- 110. General requirements
- 111. Illumination
- 112. Floors, floor openings, passageways, and stairs
- 113. Exits
- 114. Fire-extinguishing equipment
- Section 12. Installation and maintenance of equipment [Go to Page]
- 120. General requirements
- 121. Inspections
- 122. Guarding shaft ends, pulleys, belts, and suddenly moving parts
- 123. Protective grounding
- 124. Guarding live parts
- 125. Working space about electric equipment
- 126. Equipment for work on energized parts
- 127. Classified locations
- 128. Identification
- 129. Mobile hydrogen equipment
- Section 13. Rotating equipment [Go to Page]
- 130. Speed control and stopping devices
- 131. Motor control
- 132. Number 132 not used in this edition.
- 133. Short-circuit protection
- Section 14. Storage batteries [Go to Page]
- 140. General
- 141. Location
- 142. Ventilation
- 143. Racks
- 144. Floors in battery areas
- 145. Illumination for battery areas
- 146. Service facilities
- Section 15. Transformers and regulators [Go to Page]
- 150. Current-transformer secondary circuits protection when exceeding 600 V
- 151. �Grounding secondary circuits of instrument transformers
- 152. Location and arrangement of power transformers and regulators
- 153. Short-circuit protection of power transformers
- Section 16. Conductors [Go to Page]
- 160. Application
- 161. Electrical protection
- 162. Mechanical protection and support
- 163. Isolation
- 164. Conductor terminations
- Section 17. Circuit breakers, reclosers, switches, and fuses [Go to Page]
- 170. Arrangement
- 171. Application
- 172. Circuit breakers, reclosers, and switches containing oil
- 173. Switches and disconnecting devices
- 174. Disconnection of fuses
- Section 18. Switchgear and metal-enclosed bus [Go to Page]
- 180. Switchgear assemblies
- 181. Metal-enclosed bus
- Section 19. Surge arresters [Go to Page]
- 190. General requirements
- 191. Indoor locations
- 192. Grounding conductors
- 193. Installation
- Part 2. Safety Rules for the Installation and Maintenance of Overhead Electric Supply and Communi...
- Section 20. Purpose, scope, and application of rules [Go to Page]
- 200. Purpose
- 201. Scope
- 202. Application of rules
- Section 21. General requirements [Go to Page]
- 210. Referenced sections
- 211. Number 211 not used in this edition.
- 212. Induced voltages
- 213. Accessibility
- 214. Inspection and tests of lines and equipment
- 215. Grounding of circuits, supporting structures, and equipment
- 216. Arrangement of switches
- 217. General
- 218. Vegetation management
- Section 22. Relations between various classes of lines and equipment [Go to Page]
- 220. Relative levels
- 221. Avoidance of conflict
- 222. Joint use of structures
- 223. Communications protective requirements
- 224. Communication circuits located within the supply space and supply circuits located within th...
- 225. Electric railway construction
- Section 23. Clearances [Go to Page]
- 230. General
- 231. Clearances of supporting structures from other objects
- 232. Vertical clearances of wires, conductors, cables, and equipment above ground, roadway, rail,...
- 233. Clearances between wires, conductors, and cables carried on different supporting structures
- 234. Clearance of wires, conductors, cables, and equipment from buildings, bridges, rail cars, sw...
- 235. Clearance for wires, conductors, or cables carried on the same supporting structure
- 236. Climbing space
- 237. Working space
- 238. Vertical clearance between certain communications and supply facilities located on the same ...
- 239. Clearance of vertical and lateral facilities from other facilities and surfaces on the same ...
- Section 24. Grades of construction [Go to Page]
- 240. General
- 241. Application of grades of construction to different situations
- 242. Grades of construction for conductors
- 243. Grades of construction for line supports
- Section 25. Loadings for Grades B and C [Go to Page]
- 250. General loading requirements and maps
- 251. Conductor loading
- 252. Loads on line supports
- 253. Load factors for structures, crossarms, support hardware, guys, foundations, and anchors
- Section 26. Strength requirements [Go to Page]
- 260. General (see also Section 20)
- 261. Grades B and C construction
- 262. Number 262 not used in this edition.
- 263. Grade N construction
- 264. Guying and bracing
- Section 27. Line insulation [Go to Page]
- 270. Application of rule
- 271. Material and marking
- 272. Ratio of flashover to puncture voltage
- 273. Insulation level
- 274. Factory tests
- 275. Special insulator applications
- 276. Number 276 not used in this edition.
- 277. Mechanical strength of insulators
- 278. Aerial cable systems
- 279. Guy and span insulators
- 28. Section number 28 not used in this edition.
- 29. Section number 29 not used in this edition.
- Part 3. Safety Rules for the Installation and Maintenance of Underground Electric Supply and Comm...
- Section 30. Purpose, scope, and application of rules [Go to Page]
- 300. Purpose
- 301. Scope
- 302. Application of rules
- Section 31. General requirements applying to underground lines [Go to Page]
- 310. Referenced sections
- 311. Installation and maintenance
- 312. Accessibility
- 313. Inspection and tests of lines and equipment
- 314. Grounding of circuits and equipment
- 315. Communications protective requirements
- 316. Induced voltage
- Section 32. Underground conduit systems [Go to Page]
- 320. Location
- 321. Excavation and backfill
- 322. Ducts and joints
- 323. Manholes, handholes, and vaults
- Section 33. Supply cable [Go to Page]
- 330. General
- 331. Sheaths and jackets
- 332. Shielding
- 333. Cable accessories and joints
- Section 34. Cable in underground structures [Go to Page]
- 340. General
- 341. Installation
- 342. Grounding and bonding
- 343. Fireproofing
- 344. Communication cables containing special supply circuits
- Section 35. Direct-buried cable [Go to Page]
- 350. General
- 351. Location and routing
- 352. Installation
- 353. Deliberate separations—Equal to or greater than 300 mm (12 in) from underground structures o...
- 354. Random separation—Separation less than 300 mm (12 in) from underground structures or other c...
- Section 36. Risers [Go to Page]
- 360. General
- 361. Installation
- 362. Pole risers—Additional requirements
- 363. Pad-mounted installations
- Section 37. Supply cable terminations [Go to Page]
- 370. General
- 371. Support at terminations
- 372. Identification
- 373. Clearances in enclosures or vaults
- 374. Grounding
- Section 38. Equipment [Go to Page]
- 380. General
- 381. Design
- 382. Location in underground structures
- 383. Installation
- 384. Grounding and bonding
- 385. Identification
- Section 39. Installation in tunnels [Go to Page]
- 390. General
- 391. Environment
- Part 4. Rules for the Operation of Electric Supply and Communications Lines and Equipment
- Section 40. Purpose and scope [Go to Page]
- 400. Purpose
- 401. Scope
- 402. Referenced sections
- Section 41. Supply and communications systems—Rules for employers [Go to Page]
- 410. General requirements
- 411. Protective methods and devices
- Section 42. General rules for employees [Go to Page]
- 420. Personal general precautions
- 421. General operating routines
- 422. Overhead line operating procedures
- 423. Underground line operating procedures
- Section 43. Additional rules for communications employees [Go to Page]
- 430. General
- 431. Approach to energized conductors or parts
- 432. Joint-use structures
- 433. Attendant on surface at joint-use manhole
- 434. Sheath continuity
- Section 44. Additional rules for supply employees [Go to Page]
- 440. General
- 441. Energized conductors or parts
- 442. Switching control procedures
- 443. Work on energized lines and equipment
- 444. De-energizing equipment or lines to protect employees
- 445. Protective grounds
- 446. Live work
- 447. Protection against arcing and other damage while installating and maintaining insulators and...
- Appendix A—Unform system of clearances adopted in the 1990 Edition: Reference rules 232, 233, and 234
- Appendix B—Uniform clearance calculations for conductors under ice and wind conditions adopted in the 2007 Edition: Rules 230A, 232A, 233A1a(3), 234A1, 235C2b(1)(c), Definitions
- Appendix C—Example applications for Rule 250C Tables 250-2 and 250-3
- Appendix D—Determining maximum anticipated per-unit overvoltage factor (T) at the worksite
- Appendix E—Bibliography
- Index
- Procedure for revising the National Electrical Safety Code
- Time schedule for the next revision of the National Electrical Safety Code
- Working Group assignments and activities for the 2012 Edition [Go to Page]
- Subcommittee 1, Coordination (SC1)
- Subcommittee 2, Grounding Methods (SC2)
- Subcommittee 3, Electric Supply Stations (SC3)
- Subcommittee 4, Clearances—Overhead Lines (SC4)
- Subcommittee 5, Overhead Lines—Strength and Loadings (SC5)
- Subcommittee 7, Underground Lines (SC7)
- Subcommittee 8, Work Rules (SC8) [Go to Page]